Location
Hamilton, Ontario
Expertise
Transportation
Bridges
Bridge Asset Management & Inspection
Share
The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.


Project Highlights
More Transportation Projects
See all projects

Transportation
Freegold Road Functional Plan

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering

Transportation
Ray Gibbon Drive Twinning

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Infrastructure
Highway 69 Twinning

Transportation
Moody Street Overpass

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Transportation
BC Earthquake Integrated Asset Management Plan

Transportation
Medicine Hat Boardwalk Replacements

Transportation
Pioneer Pedestrian Bridge

Transportation
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
Yorkton Cycling Network

Transportation
Battleford Truss Bridge Rehabilitation
LEADERSHIP INSIGHTS
See all insights








