The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.


Project Highlights
More Transportation Projects
See all projects

Transportation
Inuvik Airport Runway 06-24 Extension and Airside Civil Infrastructure Improvements

Transportation
Duggan Bridge Replacement

Transportation
Cold Lake CRISP

Bridges
Hangingstone River Pedestrian Bridge

Transportation
Whitemud Creek Oxbow Boardwalk

Transportation
Outlook Truss Bridge Assessment

Airports
Calgary Airport Glycol Treatment Facility

Transportation
Kapuskasing River Bridge

Transportation
LNG Canada Heavy Haul Bridges

Transportation
Regulatory Application and Approvals, Valley Line LRT

Transportation
Fourth Street Pedestrian Overpass

Airports
Vancouver International Airport South Airfield Upgrades

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transportation
Casino Mine Access Road

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road
LEADERSHIP INSIGHTS
See all insights