Location
Summerland, British Columbia
Expertise
Infrastructure
Water Resources
Irrigation
Water Supply, Storage, & Distribution
Share
Since 1910, the District of Summerland has owned and operated the municipal water supply system that serves domestic and irrigation water users within the District.
The system includes ten earth dams and one concrete arch dam. The dams are used to impound spring runoff water.
In 1997, the District retained a team including Associated Engineering to perform safety appraisals of the dams. This study included comprehensive site inspections and assessments, structural and seismic analysis of the concrete dam and spillway, flood hazard assessment, concrete materials assessment of the dam and spillway, assessment of the rock abutment stability, and cost estimates for proposed rehabilitations and upgrades.
Project Highlights
More Infrastructure Projects
See all projects
Transportation
184 Street and Yellowhead Trail Interchange
Infrastructure
North Interceptor Sanitary Trunk
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Infrastructure
Highway 69 Twinning
Transportation
Cold Lake CRISP
Bridges
SkyTrain Grandview Cut Structural Upgrade
Infrastructure
Minnedosa Community Housing
Land Development
Blackwolf Community Development
Water
Jericho Reservoir
Infrastructure
Big Dock and Water Front Area Redevelopment
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Active Transportation
Highway 1 at Mountain Highway Interchange
Transportation