Location
Edmonton, Alberta
Share
The North Saskatchewan River flows southwest to northeast through a 22 kilometre valley in the City of Edmonton; the largest stretch of urban parkland in North America.
It supplies drinking water for Edmonton and dozens of downstream communities. The City of Edmonton, like most pre-1940 municipalities, is serviced in part by combined sewers.
These sewers occasionally overflow into the North Saskatchewan River in heavy rains. The Rat Creek outfall was responsible for 60%~80% of the City of Edmonton’s combined sewer overflow volume, 3.2-billion litres per year, affecting water quality in the North Saskatchewan River and raising safety concerns in Edmonton and beyond.
The $44-million West Edmonton Sanitary Sewer Tunnel W12 across the North Saskatchewan River connects the Rat Creek combined trunk to the South Highlands Interceptor and then to the Gold Bar Wastewater Treatment Plant. This was expected to reduce the CSO discharges into the North Saskatchewan River by up to 80%, significantly improving water quality.


Project Highlights
More Infrastructure Projects
See all projects

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Infrastructure
Tsawwassen Mills Mall

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program

Infrastructure
Minnedosa Community Housing

Infrastructure
Burrard Bridge Rehabilitation

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Bridges
Hangingstone River Pedestrian Bridge

Active Transportation
Highway 1 at Mountain Highway Interchange

Infrastructure
Clayton Reservoir

Infrastructure
Mooney Forest Service Road

Transportation
Don River Blvd. Bridge Rehabilitation

Containment Systems
Cell 3 East Halton Waste Management Site

Containment Systems
Asquith Landfill Decomissioning
LEADERSHIP INSIGHTS
See all insights











