Location
Whitehorse, Yukon
Expertise
Environmental
Contaminated Sites Management
Share
Associated Environmental completed a Phase II Environmental Site Assessment of a historical site in downtown Whitehorse, which was required prior to the planned development of the site.
The Assessment was conducted based on seven areas of potential environmental concern identified in previous assessments. The work was conducted in accordance with the Canadian Standards Association protocols for Phase II Environmental Site Assessments (CSA Z769-00 R2016) and the Yukon Contaminated Sites Regulation (OIC 2002/171).
Project Highlights
The scope of work included interpretation of geophysical survey and leak test reports, installation of monitoring wells, and collection and analysis of soil and groundwater samples. Based on the results of the soil and groundwater sampling and a groundwater flow analysis, we were able to delineate soil contamination, characterize groundwater contamination, and provide recommendations for further work required to ensure the safety of nearby residents and businesses.
More Environmental Projects
See all projects
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Environmental Planning, Valley Line LRT
Environmental Assessment
Environmental Assessment of Westside Road
Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Sustainable Management
Environmental Management System and Legislative Compliance Assessment
Environmental
Growth and Economic Development Strategy
Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization
Environmental
Community-Based Monitoring Software Project
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Environmental
Meadow Valley Groundwater Availability Study
Buildings
Corix Biomass Energy Centre
Water
Pitt River Inter-Tidal Habitat
Environmental
Climate Change Risk Assessment
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
LEADERSHIP INSIGHTS
See all insights