Location
Calgary, Alberta
Expertise
Environmental
Climate Change Adaptation & Mitigation
Infrastructure
Water Supply, Storage, & Distribution
Water Treatment
Strategic Advisory Services
Share
The City of Calgary retained Associated Engineering to perform a water supply infrastructure climate change vulnerability assessment.
This included the entire potable water supply system from the watershed to the distribution system including dams, pump stations, treatment plants, reservoirs and piping. The study was conducted using the Engineers Canada Public Infrastructure Engineering Vulnerability Committee (PIEVC) protocol.
The purpose of the study was to identify components of the potable water supply system that are vulnerable to future (years 2020 and 2050) extreme climatic events or significant changes to baseline climate design values compared with the past data used for design. This included assessing sensitivities of infrastructure to the changes, in terms of positive or negative consequences of changes in applicable climatic conditions and, also assessing the built-in capacity of infrastructure to absorb any net negative consequences from the predicted changes in climatic conditions.
The basis of the methodology involved assessing various climate change models and superimposing that data over the design and operational characteristics of the water supply system to identify and assess risks to the infrastructure, its expected life and performance.
Project Highlights
More Environmental Projects
See all projects
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development
Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Data System Planning
Environmental
Big Bend Master Drainage Plan
Environmental
Francis Cooke Landfill Operations Plan
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Environmental
McIntyre Dam Fish Passage
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
Environmental
Tlichǫ Cultural Commons Digital Database
Environmental Assessment
Fischer-Hallman Road Environmental Assessment
Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment
Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
LEADERSHIP INSIGHTS
See all insights