Location
Calgary, Alberta
Expertise
Environmental
Climate Change Adaptation & Mitigation
Infrastructure
Water Supply, Storage, & Distribution
Water Treatment
Strategic Advisory Services
Share
The City of Calgary retained Associated Engineering to perform a water supply infrastructure climate change vulnerability assessment.
This included the entire potable water supply system from the watershed to the distribution system including dams, pump stations, treatment plants, reservoirs and piping. The study was conducted using the Engineers Canada Public Infrastructure Engineering Vulnerability Committee (PIEVC) protocol.
The purpose of the study was to identify components of the potable water supply system that are vulnerable to future (years 2020 and 2050) extreme climatic events or significant changes to baseline climate design values compared with the past data used for design. This included assessing sensitivities of infrastructure to the changes, in terms of positive or negative consequences of changes in applicable climatic conditions and, also assessing the built-in capacity of infrastructure to absorb any net negative consequences from the predicted changes in climatic conditions.
The basis of the methodology involved assessing various climate change models and superimposing that data over the design and operational characteristics of the water supply system to identify and assess risks to the infrastructure, its expected life and performance.


Project Highlights
More Environmental Projects
See all projects

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization

Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Water
Pitt River Inter-Tidal Habitat

Environmental
Splatsin Eagle River Compensation Site Identification Site

Buildings
Corix Biomass Energy Centre

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Sustainable Management
Environmental Management System and Legislative Compliance Assessment

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Environmental Assessments, Southeast BC

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Environmental
Environmental Planning, Valley Line LRT

Environmental Assessment
Environmental Assessment of Westside Road
LEADERSHIP INSIGHTS
See all insights






