Location
Enderby, British Columbia
Expertise
Environmental
Fish, Wildlife & Ecosystems
Infrastructure
Indigenous Communities
Share
The purpose of this project was to identify and rank potential fish habitat enhancement opportunities in the Eagle River Watershed.
Splatsin First Nations was seeking advice on potential habitat enhancement opportunities within their traditional territory with the aim of offsetting current and future losses of in stream habitat, which results from development activities.
The project included the review of background data, investigation into current and proposed fisheries projects for the watercourse, review of topographic and orthographic imagery at an office based level, and followed by ground trothing. Ground trothing of the potential habitat enhancement sites was completed. Detailed information on site characteristics and habitat conditions were collected, including: channel characteristics, habitat value, water quality conditions, flow conditions and connectivity, fisheries presence, and site access.

Client
Splatsin First Nations

Project Highlights
More Environmental Projects
See all projects

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Environmental
Okanagan Valley Drought Planning

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Environmental
Monthly Water Budget, Similkameen Valley Aquifer

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
Data System Planning

Environmental
Deh Cho Bridge, Environmental Services

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Environmental
Port of Vancouver – Climate Change Adaptation

Containment Systems
Silverberry Secure Landfill

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
Climate Change Risk Assessment
LEADERSHIP INSIGHTS
See all insights







