Location
Lethbridge, Alberta
Expertise
Transportation
Active Transportation
Roads
Traffic Engineering
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.

Client
City of Lethbridge

Project Highlights
More Transportation Projects
See all projects

Transportation
Pioneer Pedestrian Bridge

Transportation
St. Albert Transportation Master Plan

Transportation
Regulatory Application and Approvals, Valley Line LRT

Transit
SkyTrain Fraser River Crossing North Approach Spans

Transportation
Freegold Road Functional Plan

Transportation
Coast Meridian Overpass Detailed Inspection

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
Saline Creek Drive Pedestrian Bridge

Transportation
Duggan Bridge Replacement

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Infrastructure
Highway 69 Twinning

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
John Hextall Bridge Rehabilitation

Streetscaping
Vanalman Avenue Upgrades
LEADERSHIP INSIGHTS
See all insights









