John Matthews Creek receives runoff from a watershed that is composed largely of historic urban development which predates current stormwater management practices.
Historically, the deep, steeply sided V-shaped John Matthews Creek ravine has experienced slope instabilities due to creek erosion. The City engaged Associated Engineering to develop a management strategy to prevent future problems by controlling flows entering the ravine, and to mitigate a known erosion site identified in a previous study.
During the course of the assignment, and after a series of small storms, a rapidly advancing headcut formed a deeply incised trough approximately 100 m long and up to 10 m deep at the upstream end. The destabilization resulted in deposition of large amounts of sediment in the lowland fish bearing reaches and created long-term risks of block slope failures due to the deep cut.
Client
The City of Burnaby
Project Highlights
Associated Engineering undertook conceptual planning, detailed design and construction phase services for the John Matthews Creek project including a flow diversion, and restoration of stable ravine and creek channel. The project involved significant challenges in site access, slope stabilization, and incorporating environmental features to mimic the natural morphology of the creek. Associated Engineering incorporated a high flow diversion pipe constructed within the restored valley bottom. Our approach allowed for balancing of environmentally sound design with civil engineering fundamentals. Specific design features included boulder weirs and vegetated riprap bank protection
People on this project
More Environmental Projects
See all projects
Environmental Assessment
Environmental Assessment of Westside Road
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Environmental
Data System Planning
Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan
Environmental Planning
Regina Bypass – Environmental Services
Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
Environmental Assessments, Southeast BC
Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
Environmental
Climate Change Risk Assessment
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Environmental
Contamination Management, Valley Line LRT
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
Environmental
Community-Based Monitoring Software Project
LEADERSHIP INSIGHTS
See all insights