Associated, as part of the Edmonton Valley Line LRT design and construction team, was responsible for the identification (Alberta Tier 1 Soil and Groundwater Remediation Guidelines), quantification, and management of all contaminated soils and groundwater intersected by the 13.1 km alignment, which passes through seven known contaminated sites and numerous newly identified sites that include old landfills, gas stations, and industrial properties.
The required tasks included a review of all available Phase II reports relevant to the project development, the identification of data gaps, the preparation of supplementary soil testing plans so that adequate site-specific data were available, and the preparation of maps and cross-sections that highlight the depth and extent of contamination within the proposed works areas. The findings of this analysis were used to prepare site-specific Contamination Management Plans that detail the locations and depths of contamination, health and safety requirements (e.g., landfill gas monitoring), confirmatory sampling plans, as well as post-excavation disposal/handling strategies. Soil re-use opportunities were determined through an analysis of fill location land use and Alberta Tier 2 Soil and Groundwater Remediation Guidelines.

Client
City of Edmonton

Project Highlights
More Environmental Projects
See all projects

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Environmental Planning
Regina Bypass – Environmental Services

Environmental
Port of Vancouver – Climate Change Adaptation

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Water
Pitt River Inter-Tidal Habitat

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental
Climate Change Risk Assessment

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Buildings
Climate Change Risk Assessment for Buildings

Environmental
Revegetation Manual Revisions
LEADERSHIP INSIGHTS
See all insights