Mosquito First Nation, Saskatchewan
Expertise
Infrastructure
Indigenous Communities
Urban Drainage
Share
Mosquito First Nation has experienced flooding and drainage issues in the community core as a result of a number of consecutive high precipitation years.
Aboriginal Affairs & Northern Development Canada engaged Associated Engineering to conduct a comprehensive drainage improvement study of the community. Specifically, the work included emergency flood remediation during the spring and summer of 2013 to alleviate the high water levels which impacted critical infrastructure, including the community sewage pumping station, homes, and roadways.
Client
Aboriginal Affairs & Northern Development Canada
Project Highlights
More Infrastructure Projects
See all projects
Infrastructure
Gregoire Sanitary Sewer
Infrastructure
Gold Bar Wastewater Treatment Plant
Infrastructure
Minnedosa Community Housing
Infrastructure
Gitwinksihlkw Water Treatment Plant
Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction
Streetscaping
Langford Cultural District
Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station
Energy
Site C Clean Energy
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Environmental
Port of Vancouver – Climate Change Adaptation
Infrastructure
Roads and Drainage Construction, Lake Babine Nation
Infrastructure
Glenmore Landfill Entrance
Computational Fluid Dynamics Analysis