Associated Environmental completed a Phase II Environmental Site Assessment of a historical site in downtown Whitehorse, which was required prior to the planned development of the site.
The Assessment was conducted based on seven areas of potential environmental concern identified in previous assessments. The work was conducted in accordance with the Canadian Standards Association protocols for Phase II Environmental Site Assessments (CSA Z769-00 R2016) and the Yukon Contaminated Sites Regulation (OIC 2002/171).


Project Highlights
The scope of work included interpretation of geophysical survey and leak test reports, installation of monitoring wells, and collection and analysis of soil and groundwater samples. Based on the results of the soil and groundwater sampling and a groundwater flow analysis, we were able to delineate soil contamination, characterize groundwater contamination, and provide recommendations for further work required to ensure the safety of nearby residents and businesses.
More Environmental Projects
See all projects

Environmental
Environmental Planning, Valley Line LRT

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
Tlichǫ Cultural Commons Digital Database

Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy

Environmental
Data System Planning

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan

Environmental
Community-Based Monitoring Software Project

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Climate Change Risk Assessment

Environmental
Meadow Valley Groundwater Availability Study

Water
Pitt River Inter-Tidal Habitat

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Revegetation Manual Revisions
LEADERSHIP INSIGHTS
See all insights