The Site C hydroelectric dam and generating station is the largest construction project ever undertaken in BC designed to provide 1,100 megawatts (MW) of capacity and produce approximately 5,100 GWh of electricity each year.
Reporting to the Executive Vice-President, Associated Engineering is the project’s Quality Lead supporting the project’s overall quality management system (QMS) through consultative and advisory services to the project’s own quality manager and its other quality representatives.
In evaluating the project’s existing QMS, Associated Engineering led a coordinated effort with BC Hydro representatives to develop and implement many QMS improvements such as a quality performance indicator monitoring program, revisions to the project’s quality documentation, and structuring a more active and relevant internal and external quality audit and surveillance program.


Project Highlights
Work continues, building understanding with stakeholders about the changes to the QMS and achieving positive “buy-in” at all organizational levels. Improvements to site operations with regards to quality has been evidenced and work continues to achieve the goals and needs of the project.
Effective management of quality contributes to greater confidence that the work planned and performed will meet the required expectations, standards, and best practices for all. Most importantly, it helps to decrease risk and costs by investing in and implementing preventative measures while anticipating and resolving issues before they adversely affect schedule and budget.
More Energy Projects
See all projects

Building Mechanical
Yard Works Facility Emergency Backup Generator

Energy
Sylvan Lake Instrumentation & Control Services

Energy
Fort McMurray Wastewater Treatment Plant – Instrumentation, Controls & Automation

Energy
Marine Gateway

Energy
Process Energy Audits

Energy
Liquefied Natural Gas for Electrical Generation

Energy
Surrey Civic Centre Plaza

Energy
Red Deer Wastewater Treatment Plant – PLC, Instrumentation and Controls Retrofit

Energy
Minoru Aquatic Complex

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Building Mechanical
Elijah Smith School Energy Audit

Energy
Gateway Theatre Wastewater Heat Recovery

Strategic Advisory Services
Lethbridge Energy Efficiency Master Plan and Strategy

Energy
Solar Photovoltaic System Installation

Energy