Location
Calgary, Alberta
Expertise
Share
The Calgary Zoo was inundated with water during the June 2013 flooding in Calgary, AB.
Following the flood event, Associated was selected as part of a team to develop a flood protection plan for St. George’s Island, where the zoo is located. To inform the design of flood protection infrastructure for the zoo, the project team completed groundwater monitoring, sampling, and numerical modelling. Groundwater and surface water quality samples provided key information to understand surface groundwater interactions.
Groundwater quality sampling helped to identify characteristics of groundwater aquifers flowing into the island. Associated’s contribution and modelling results helped determine the effectiveness of various engineering solutions and to define what would be required to protect the zoo from future flood events.

Client
City of Calgary
Awards
Consulting Engineers of Alberta, Award of Excellence; Consulting Engineers of Alberta, Award of Merit

Project Highlights
More Environmental Projects
See all projects

Infrastructure
Roads and Drainage Construction, Lake Babine Nation

Environmental
Drinking Water System Improvements in Quaaout Community

Environmental
Okanagan Valley Drought Planning

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Infrastructure
Drainage Improvement Study

Transportation
Regulatory Application and Approvals, Valley Line LRT

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Environmental
Bow River Pedestrian Bridge and Utility Crossing

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Transportation
Highway 7 Haney Bypass Intersection Improvements

Environmental
Community-Based Monitoring Software Project

Infrastructure
Heavy Rainfall Event Disaster Recovery
LEADERSHIP INSIGHTS
See all insights






