Location
Prince George, British Columbia
Expertise
Environmental
Hydrogeology
Share
The City of Prince George retailed Associated Environmental to complete a preliminary investigation of an existing water supply well to determine whether the well could be used to augment water supply for a proposed new subdivision.
This required assessing the quality, quantity, and construction details of the well, and providing advice on the regulatory permitting process. As part of the project, we completed the following:
- Preformed a desktop study to review available site, climate, and relevant geological data
- Oversaw a down-hole camera survey of the well to confirm well construction details
- Supervised aquifer tests on the well and calculated the long-term sustainable yield
- Collected a representative groundwater quality sample and compared the results with Health Canada’s drinking water guidelines and Northern Health’s requirements
- Reviewed the regulatory framework under the Water Sustainability Act and Northern Health, and summarized the permitting requirements to bring the well into production
- Identified next steps, including timelines for regulatory permits and estimated costs


Project Highlights
People on this project
More Environmental Projects
See all projects

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration

Environmental
Francis Cooke Landfill Operations Plan

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Buildings
Corix Biomass Energy Centre

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Big Bend Master Drainage Plan

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Environmental
Environmental Planning, Valley Line LRT
LEADERSHIP INSIGHTS
See all insights






