Location
Calgary, Alberta
Expertise
Environmental
Environmental Assessment
Infrastructure
Pipelines
Wastewater Collection & Storage
Share
As part of the Calgary Southwest Ring Road project, Alberta Transportation needed to construct a new stormwater management trunk sewer within the 37 Street SW right-of-way, south of Lakeview Drive SW with a new outfall to the Glenmore Reservoir / Elbow River, to replace the existing storm trunk that crosses the Tsuut’ina Nation Lands.
To meet Alberta Transportation’s schedule and in collaboration with the City, Associated Engineering as the Prime Consultant, proposed to divide the project into two phases. This approach met Alberta Transportation’s schedule and allowed the City and Associated Engineering to perform their due diligence by conducting the necessary environmental assessments in the park area. These included a biophysical impact assessment and fish habitat assessment.


Project Highlights
Contract 1, the northern portion of the project, comprised 1.4 kilometres of 2400 millimetre diameter trunk sewer from Lakeview Drive to 66 Avenue. Contract 2 spans from 66 Avenue through North Glenmore Park to the Glenmore Reservoir. Contract 2 includes 1.6 kilometres of 2400 millimetre diameter storm trunk sewer, a diversion structure to an offline oil-grit separator, a piled slope stabilization wall to support an unstable slope, an energy dissipation structure, and a new outfall to the Glenmore Reservoir.
More Environmental Projects
See all projects

Environmental
Tlichǫ Cultural Commons Digital Database

Environmental
Environmental Planning, Valley Line LRT

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Environmental
Growth and Economic Development Strategy

Environmental
Community Lands Engagement Study & Environmental Site Assessment

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Revegetation Manual Revisions

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Transportation
Miette Hot Springs Culvert and Bridge Replacement

Water
Pitt River Inter-Tidal Habitat

Environmental
Francis Cooke Landfill Operations Plan

Buildings
Climate Change Risk Assessment for Buildings
LEADERSHIP INSIGHTS
See all insights







