Location
Vancouver, British Columbia
Expertise
Transportation
Bridges
Bridge Rehabilitation & Retrofit
Seismic Evaluation & Retrofitting
Infrastructure
Share
Associated Engineering developed a bearing replacement scheme to address the removal of PCB contaminants in the main truss span bearings of this highly visible eight-lane structure.
Mandatory bearing replacement offered the ideal opportunity to upgrade the steel truss spans by installing base isolation bearings and enhancing seismic performance.
Seismic base-isolation design was carried out to extract optimal performance from the existing capacity-limited substructure. Key to bearing replacement was to develop a scheme to jack up the steel trusses, which had no jacking provision. Innovative designs were prepared for the complex temporary work needed to replace bearings of up to 7 MN load capacity.

Client
City of Vancouver

Project Highlights
Key services included:
- Inspection of the truss spans.
- Preliminary and detailed design for the bearing replacements.
- Integration of construction staging and public safety into the designs.
- Load rating of the truss spans using 3-D BIM and structural modeling.
- Structural evaluation, design, and construction services for concrete pier strengthening.
- Seismic assessment using modern bridge performance criteria.
- Development of environmental authorization applications, and liaison with Federal Agencies regarding application of PCB regulations to bridges.
More Transportation Projects
See all projects

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Infrastructure
Churchill Airport Runway Upgrades

Infrastructure
Highway 69 Twinning

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Transportation
Outlook Truss Bridge Assessment

Transportation
Shell Canterra Road

Transportation
Moody Street Overpass

Transportation
Vancouver International Airport Rainwater Harvesting

Transportation
Saline Creek Drive Pedestrian Bridge

Transportation
Bobtail Forest Service Road Overpass

Transportation
Highway 16 SAFE Corridor

Transportation
Ioco Road / Bedwell Bay Road Improvements

Transportation
Sutherland Ave Pedestrian Bridge

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Transportation
Bellevue Creek Bridge
LEADERSHIP INSIGHTS
See all insights








