As a part of ongoing management of the City of Edmonton’s bridge inventory, three bridges in the environmentally sensitive River Valley were identified for rehabilitation in 2011 and 2012.
These include: Grierson Bridge (a four-span voided slab structure), MacDonald Drive Pedestrian Underpass (a single-span waffle-slab buried structure) and Rossdale Bridge (a three-span solid slab structure).
The City’s objective was to extend the service life of the structures by 20 to 25 years. Associated Engineering was retained to provide a condition assessment, rehabilitation design and resident engineering services during rehabilitation construction of these bridges.

Client
The CIty of Edmonton

Project Highlights
175mm
concrete removed
The Rossdale Bridge, a three-span 48 metre long reinforced concrete bridge constructed in 1957, was identified for a condition assessment due to the poor condition of the superstructure. It was found that the deck concrete had high chloride levels, well in excess of the corrosion threshold for steel in the top 110 millimetres. The strategy adopted for rehabilitation comprised of removal of the top 175 millimetres of concrete by hydrodemolition, installation of new stainless steel reinforcing over the piers, conversion of the abutments to semi-integral, and a new high performance concrete overlay complete with waterproofing and an asphalt wearing surface.
More Bridges Projects
See all projects

Transportation
Duggan Bridge Replacement

Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services

Bridges
Willingdon Avenue Overpass Seismic Retrofit

Transportation
Still Creek Pedestrian Bridge Replacement

Bridges
Sucker River Bridge Replacement

Bridges
Agnico Eagle Heavy Haul Bridges

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Bridges
Yoho Bridge Concrete Design

Transportation
Glenmore Dam Utility Relocation

Transportation
Outlook Truss Bridge Assessment

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Bridges
Lake City Overhead Seismic Retrofit and Structural Rehabilitation

Transportation
Kapuskasing River Bridge

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
LEADERSHIP INSIGHTS
See all insights