Location
Calgary, Alberta
Expertise
Share
The City of Calgary retained Associated Engineering to perform a water supply infrastructure climate change vulnerability assessment.
This included the entire potable water supply system from the watershed to the distribution system including dams, pump stations, treatment plants, reservoirs and piping. The study was conducted using the Engineers Canada Public Infrastructure Engineering Vulnerability Committee (PIEVC) protocol.
The purpose of the study was to identify components of the potable water supply system that are vulnerable to future (years 2020 and 2050) extreme climatic events or significant changes to baseline climate design values compared with the past data used for design. This included assessing sensitivities of infrastructure to the changes, in terms of positive or negative consequences of changes in applicable climatic conditions and, also assessing the built-in capacity of infrastructure to absorb any net negative consequences from the predicted changes in climatic conditions.
The basis of the methodology involved assessing various climate change models and superimposing that data over the design and operational characteristics of the water supply system to identify and assess risks to the infrastructure, its expected life and performance.


Project Highlights
More Environmental Projects
See all projects

Water Resources
Pitt River Inter-Tidal Habitat

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Environmental
Highway 40 Emergency Flood Reconstruction

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Environmental
Splatsin Eagle River Compensation Site Identification Site

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Environmental
McIntyre Dam Fish Passage

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Bridges
Haisla Bridge Replacement

Environmental
Drinking Water System Improvements in Quaaout Community

Environmental
Deh Cho Bridge, Environmental Services

Environmental
Contamination Management, Valley Line LRT
LEADERSHIP INSIGHTS
See all insights







