Location
Enderby, British Columbia
Expertise
Share
The purpose of this project was to identify and rank potential fish habitat enhancement opportunities in the Eagle River Watershed.
Splatsin First Nations was seeking advice on potential habitat enhancement opportunities within their traditional territory with the aim of offsetting current and future losses of in stream habitat, which results from development activities.
The project included the review of background data, investigation into current and proposed fisheries projects for the watercourse, review of topographic and orthographic imagery at an office based level, and followed by ground trothing. Ground trothing of the potential habitat enhancement sites was completed. Detailed information on site characteristics and habitat conditions were collected, including: channel characteristics, habitat value, water quality conditions, flow conditions and connectivity, fisheries presence, and site access.

Client
Splatsin First Nations

Project Highlights
More Environmental Projects
See all projects

Buildings
Corix Biomass Energy Centre

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Infrastructure
Roads and Drainage Construction, Lake Babine Nation

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental Planning
Regina Bypass – Environmental Services

Environmental
Drinking Water System Improvements in Quaaout Community

Environmental
Francis Cooke Landfill Operations Plan

Infrastructure
Drainage Improvement Study

Environmental
McIntyre Dam Fish Passage

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Environmental
Contamination Management, Valley Line LRT
LEADERSHIP INSIGHTS
See all insights






