Associated Engineering was contracted to provide engineering services for the Emergency Flood Damage Reduction Program.
Due to high amounts of rain through May, June and July properties and communities were in risk of flooding. Emergency drainage improvements were designed and implemented, along with long term solutions in some instances.
Associated Engineering was requested to provide technical assistance and site inspections for the nine separate locations. Reports were prepared for the Water Security Agency to outline emergency flood relief measures and site investigations including major construction. These mitigation measures were needed immediately, and could be altered to be long term.


Project Highlights
More Environmental Projects
See all projects

Environmental
37 Street SW Storm Trunk Relocation

Environmental
Big Bend Master Drainage Plan

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration

Environmental
Splatsin Eagle River Compensation Site Identification Site

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Transportation
Highway 7 Haney Bypass Intersection Improvements

Containment Systems
Silverberry Secure Landfill

Water
Yorkton West Storm Drainage Study

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Tlichǫ Cultural Commons Digital Database

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Meadow Valley Groundwater Availability Study
LEADERSHIP INSIGHTS
See all insights