John Matthews Creek receives runoff from a watershed that is composed largely of historic urban development which predates current stormwater management practices.
Historically, the deep, steeply sided V-shaped John Matthews Creek ravine has experienced slope instabilities due to creek erosion. The City engaged Associated Engineering to develop a management strategy to prevent future problems by controlling flows entering the ravine, and to mitigate a known erosion site identified in a previous study.
During the course of the assignment, and after a series of small storms, a rapidly advancing headcut formed a deeply incised trough approximately 100 m long and up to 10 m deep at the upstream end. The destabilization resulted in deposition of large amounts of sediment in the lowland fish bearing reaches and created long-term risks of block slope failures due to the deep cut.

Client
The City of Burnaby

Project Highlights
Associated Engineering undertook conceptual planning, detailed design and construction phase services for the John Matthews Creek project including a flow diversion, and restoration of stable ravine and creek channel. The project involved significant challenges in site access, slope stabilization, and incorporating environmental features to mimic the natural morphology of the creek. Associated Engineering incorporated a high flow diversion pipe constructed within the restored valley bottom. Our approach allowed for balancing of environmentally sound design with civil engineering fundamentals. Specific design features included boulder weirs and vegetated riprap bank protection
People on this project
More Environmental Projects
See all projects

Environmental
Environmental Planning, Valley Line LRT

Environmental
Community Lands Engagement Study & Environmental Site Assessment

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Sustainable Management
Environmental Management System and Legislative Compliance Assessment

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Environmental
Preliminary Well Investigation

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Environmental Assessment
Environmental Assessment of Westside Road

Environmental
Data System Planning

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental
37 Street SW Storm Trunk Relocation

Environmental
Drinking Water System Improvements in Quaaout Community

Transportation
Highway 7 Haney Bypass Intersection Improvements

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
LEADERSHIP INSIGHTS
See all insights