John Matthews Creek receives runoff from a watershed that is composed largely of historic urban development which predates current stormwater management practices.
Historically, the deep, steeply sided V-shaped John Matthews Creek ravine has experienced slope instabilities due to creek erosion. The City engaged Associated Engineering to develop a management strategy to prevent future problems by controlling flows entering the ravine, and to mitigate a known erosion site identified in a previous study.
During the course of the assignment, and after a series of small storms, a rapidly advancing headcut formed a deeply incised trough approximately 100 m long and up to 10 m deep at the upstream end. The destabilization resulted in deposition of large amounts of sediment in the lowland fish bearing reaches and created long-term risks of block slope failures due to the deep cut.

Client
The City of Burnaby

Project Highlights
Associated Engineering undertook conceptual planning, detailed design and construction phase services for the John Matthews Creek project including a flow diversion, and restoration of stable ravine and creek channel. The project involved significant challenges in site access, slope stabilization, and incorporating environmental features to mimic the natural morphology of the creek. Associated Engineering incorporated a high flow diversion pipe constructed within the restored valley bottom. Our approach allowed for balancing of environmentally sound design with civil engineering fundamentals. Specific design features included boulder weirs and vegetated riprap bank protection
People on this project
More Environmental Projects
See all projects

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
Port of Vancouver – Climate Change Adaptation

Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study

Environmental
Climate Change Risk Assessment

Environmental
McIntyre Dam Fish Passage

Strategic Advisory Services
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Water Resources
Pitt River Inter-Tidal Habitat

Environmental
Growth and Economic Development Strategy

Transportation
Edmonton Valley Line – Stage 1

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Environmental
Okanagan Valley Drought Planning

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process
LEADERSHIP INSIGHTS
See all insights