The Miette Hot Springs, in Jasper National Park, was built in the 1930’s and has been in use ever since.
In 2015/2016, the crossing at Sulphur Creek (including the relocation of two outfalls, the pool dechlorination channel and wastewater treatment plant effluent discharge) was replaced as part of the wastewater treatment plant upgrade project. The existing crossing was two 1800 mm diameter corrugated steel pipe culverts, which allowed Sulfur Creek to pass under the pedestrian path. The culverts were in poor structural condition, and presented barriers to fish passage. The proposed replacement crossing was a single span bridge, approximately 30 m wide and 20 m long. which would have a smaller footprint than the existing crossing.


Project Highlights
6.1m
span
3.1m
rise
Based on information provided by Associated Engineering and the preliminary geotechnical information, it was decided that the detailed design of a corrugated steel arch with a 6.1 m span and 3.1 m rise supported on concrete strip footings would be the choice of structure. Due to the relatively steep gradient (about 5%) of Sulphur Creek at the location, there was concerns with the relatively deep scours; thus, the base of the footings was proposed to be between 1.5 m and 2 m, below the streambed elevation.
People on this project
More Infrastructure Projects
See all projects

Water
Jericho Reservoir

Land Development
Blackwolf Community Development

Building Structures
Bone Yard Operations Centre Office Expansion

Environmental
Calgary Zoo Flood Mitigation

Containment Systems
Cell 3 East Halton Waste Management Site

Transportation
Coast Meridian Overpass

Infrastructure
Drainage Improvement Study

Infrastructure
Raw Water Supply – Pipeline River Crossing

Transportation
Bellevue Creek Bridge

Infrastructure
Highway 69 Twinning

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Transportation
Glenmore Dam Utility Relocation

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
LEADERSHIP INSIGHTS
See all insights