Location
St. Albert, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Share
The City of St. Albert retained Associated Engineering and McElhanney, along with Thurber, ENC Testing, ACI, and Trace to complete the Ray Gibbon Drive improvements. These improvements were broken down into three phases (2, 3, and 4).
Associated Engineering’s scope of work included preliminary design of a rail bridge grade separation, a new pedestrian bridge, and a second bridge over the Sturgeon River. The bridge over the Sturgeon River was advance to detailed design and construction. In addition to the major work that included the design and construction services for the twinning of Ray Gibbon Drive over Sturgeon River, we also completed drainage, electrical and environmental scopes for the project.

Client
City of St. Albert

Project Highlights
$5.23M
Construction Value
2022
Completed
More Transportation Projects
See all projects

Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass

Transportation
Kitsault Mine Access Road and Bridge Assessments

Transportation
7 Avenue S. Bike Boulevard

Transportation
170th Street Pedestrian Bridge

Transportation
Kapuskasing River Bridge

Transportation
LNG Canada Heavy Haul Bridges

Streetscaping
Nigel Valley Public Spaces

Transportation
Regulatory Application and Approvals, Valley Line LRT

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
John Hextall Bridge Rehabilitation

Transportation
Transportation Planning Studies

Transportation
Bobtail Forest Service Road Overpass

Transportation
Saline Creek Drive Pedestrian Bridge

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process
LEADERSHIP INSIGHTS
See all insights








