As part of the Calgary Southwest Ring Road project, Alberta Transportation needed to construct a new stormwater management trunk sewer within the 37 Street SW right-of-way, south of Lakeview Drive SW with a new outfall to the Glenmore Reservoir / Elbow River, to replace the existing storm trunk that crosses the Tsuut’ina Nation Lands.
To meet Alberta Transportation’s schedule and in collaboration with the City, Associated Engineering as the Prime Consultant, proposed to divide the project into two phases. This approach met Alberta Transportation’s schedule and allowed the City and Associated Engineering to perform their due diligence by conducting the necessary environmental assessments in the park area. These included a biophysical impact assessment and fish habitat assessment.
Project Highlights
Contract 1, the northern portion of the project, comprised 1.4 kilometres of 2400 millimetre diameter trunk sewer from Lakeview Drive to 66 Avenue. Contract 2 spans from 66 Avenue through North Glenmore Park to the Glenmore Reservoir. Contract 2 includes 1.6 kilometres of 2400 millimetre diameter storm trunk sewer, a diversion structure to an offline oil-grit separator, a piled slope stabilization wall to support an unstable slope, an energy dissipation structure, and a new outfall to the Glenmore Reservoir.
More Environmental Projects
See all projects
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp
Environmental
Regulatory Application and Approvals, Valley Line LRT
Environmental
Revegetation Manual Revisions
Sustainable Management
Environmental Management System and Legislative Compliance Assessment
Environmental Assessment
Environmental Assessment of Westside Road
Buildings
Corix Biomass Energy Centre
Environmental
Francis Cooke Landfill Operations Plan
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
Environmental
Growth and Economic Development Strategy
Environmental
Big Bend Master Drainage Plan
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring
Buildings
Climate Change Risk Assessment for Buildings
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
LEADERSHIP INSIGHTS
See all insights