The Town of Banff built a new pedestrian bridge over the Bow River in 2012/2013.
The bridge accommodates utility lines that move sanitary and potable water from the north side of the river to the south. As a project condition for conducting these works within Banff National Park, an Emergency Response Plan (ERP) and an Erosion and Sediment Control Plan (ESCP) were required prior to commencing construction.

Client
StructureCraft Builders Inc.

Project Highlights
Associated Environmental Consultants was contracted by StructureCraft Builders Inc. to advise and prepare these documents prior to initiating construction in the fall of 2012. The ERP was a guide designed to establish a communication plan, identify contingencies for environmental emergencies, and specify the reporting procedure for environmental emergencies. It included general guidelines for protecting water quality, fish and fish habitat, wildlife, vegetation, and historical resources.
The ESCP was based on established best management practices for erosion and sediment control. It detailed existing site conditions, identified areas of concern, and listed recommended mitigation measures and relevant best management practices.
More Environmental Projects
See all projects

Environmental
Preliminary Well Investigation

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Environmental
Environmental Assessments, Southeast BC

Environmental
Meadow Valley Groundwater Availability Study

Strategic Advisory Services
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration

Environmental
Tlichǫ Cultural Commons Digital Database

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
Calgary Zoo Flood Mitigation

Environmental
Okanagan Valley Drought Planning

Water Resources
Pitt River Inter-Tidal Habitat

Environmental
Port of Vancouver – Climate Change Adaptation

Environmental
Emergency Flood Damage Reduction Program

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments
LEADERSHIP INSIGHTS
See all insights