Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Associated completed the environmental screening and clearance reporting required for Enbridge’s Integrity Dig Program on Line 21 from Norman Wells, NT to Zama, AB.
Associated visited the proposed dig sites to record pre-disturbance conditions and investigate features that could trigger a territorial or federal regulation. Based on the environmental screening, a clearance report was developed detailing soil salvage, handling, and storage requirements for the construction crew to follow.
After construction, Associated completed a post-reclamation survey for each screened site, which entailed soil and vegetation monitoring. A post-reclamation assessment report was prepared for each site, which was provided to the First Nation communities and other stakeholders in the surrounding areas.


Project Highlights
More Environmental Projects
See all projects

Infrastructure
Drainage Improvement Study

Environmental
37 Street SW Storm Trunk Relocation

Infrastructure
Heavy Rainfall Event Disaster Recovery

Alternative Delivery
Pitt River Bridge

Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas

Environmental
Revegetation Manual Revisions

Environmental
Deh Cho Bridge, Environmental Services

Environmental
Stage 1 & 2 Preliminary Site Investigations and Limited Detailed Site Investigation

Environmental
Meadow Valley Groundwater Availability Study

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Edmonton Valley Line – Stage 1

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Water
Yorkton West Storm Drainage Study

Environmental
Okanagan Valley Drought Planning

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
LEADERSHIP INSIGHTS
See all insights