Location
Revelstoke, British Columbia
Share
Associated Environmental Consultants Inc. assisted Advanced Energy Systems with a Water Act application to construct a 9 MW run-of-river hydroelectric facility on South Cranberry Creek, 26 km south of Revelstoke, B.C.
The South Cranberry facility was constructed and began operation in December 2007.
Since then, we have assisted with the completion of post-construction monitoring requirements based on the Fisheries Act authorization for the project. The studies range from 5 to 15 years in duration, and include monitoring riparian revegetation survival. Riparian compensation requirements include a 2:1 replacement of areas permanently impacted by the project and the 1:1 revegetation of areas temporarily impacted by construction. Tree and shrubs were planted at a density of one tree per 9 m2, and one shrub per 1 m2. Plant survival was monitored until 90% survival was reached.


Project Highlights
Our team conducted survival rate counts and replaced dead and dying plants in years 1 and 2 of the monitoring program. In years 3 to 6, plant growth was too dense to accurately estimate survival, so monitoring methods shifted to estimating overall stem density of revegetated areas by establishing plots and completing stem counts of live trees and shrubs. The survival success rates continue to increase at this ongoing project.
More Environmental Projects
See all projects

Infrastructure
Heavy Rainfall Event Disaster Recovery

Environmental
Monthly Water Budget, Similkameen Valley Aquifer

Environmental
Highway 40 Emergency Flood Reconstruction

Environmental
Community-Based Monitoring Software Project

Environmental
Data System Planning

Environmental
Environmental Assessments, Southeast BC

Buildings
Climate Change Risk Assessment for Buildings

Environmental
McIntyre Dam Fish Passage

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization

Environmental
Contamination Management, Valley Line LRT

Environmental
Climate Change Risk Assessment

Environmental
Splatsin Eagle River Compensation Site Identification Site

Environmental
Community Lands Engagement Study & Environmental Site Assessment

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Edmonton Valley Line – Stage 1
LEADERSHIP INSIGHTS
See all insights