Associated Engineering was retained by the Okanagan Nation Alliance to design and construct 5 new overshot gates at the McIntyre Dam to allow traditional sockeye salmon passage to resume beyond the structure.
Since its original construction 95 years earlier, salmon and fish passage and migration stopped at this structure.
McIntyre Dam controls water levels in Vaseux Lake and Okanagan River flows between Vaseux and Osoyoos Lakes, as part of the Okanagan Lake Regulation System (OLRS). The OLRS is owned, operated and maintained by the BC Ministry of Environment (MOE) through its Water Stewardship Division in Penticton.

Client
Okanagan Nation Alliance

Project Highlights
More Environmental Projects
See all projects

Environmental
Big Bend Master Drainage Plan

Environmental
Revegetation Manual Revisions

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Bridges
Haisla Bridge Replacement

Infrastructure
Drainage Improvement Study

Environmental Planning
Regina Bypass – Environmental Services

Environmental
MacFarlane Creek Drainage Study

Environmental
Bow River Pedestrian Bridge and Utility Crossing

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Environmental
Okanagan Valley Drought Planning

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
LEADERSHIP INSIGHTS
See all insights