Associated Engineering was contracted to provide engineering services for the Emergency Flood Damage Reduction Program.
Due to high amounts of rain through May, June and July properties and communities were in risk of flooding. Emergency drainage improvements were designed and implemented, along with long term solutions in some instances.
Associated Engineering was requested to provide technical assistance and site inspections for the nine separate locations. Reports were prepared for the Water Security Agency to outline emergency flood relief measures and site investigations including major construction. These mitigation measures were needed immediately, and could be altered to be long term.


Project Highlights
More Environmental Projects
See all projects

Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Infrastructure
Drainage Improvement Study

Environmental
Monthly Water Budget, Similkameen Valley Aquifer

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Environmental
Deh Cho Bridge, Environmental Services

Infrastructure
Heavy Rainfall Event Disaster Recovery

Alternative Delivery
Pitt River Bridge

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Bridges
Haisla Bridge Replacement

Climate Change Adaptation & Mitigation
Calgary Northwest Inner City Drainage Study

Environmental
Contamination Management, Valley Line LRT

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization
LEADERSHIP INSIGHTS
See all insights