Location
Coldstream, British Columbia
Share
Coldstream Ranch operates a 3,000-hectare operation in the Coldstream Valley east of the City of Vernon, comprising of a large cattle operation, and is active in harvesting timber and extracting aggregate.
Gravel extraction occurs in the Rosebush Pit, on land that is within the BC Agricultural Land Reserve. Extraction is conducted by a local, third-party contractor that has been running the open gravel pit since the late-1980s. Since the mid-1990s, Coldstream Ranch has retained Associated Environmental for both planning and monitoring their extraction and reclamation.
We updated the current extraction and reclamation plan. The updated plan covers areas proposed for future gravel extraction and reclamation, and also addresses how the proposed activities will aid in achieving the reclamation objectives specified in the Agricultural Land Commission Permit. As part of the conditions to mine the Rosebush Pit, Coldstream Ranch is required to submit regular extraction and reclamation monitoring reports to the Agricultural Land Commission, as well as quarterly reports monitoring the reclamation land balance.

Client
Coldstream Ranch

Project Highlights
The last application for gravel extraction was submitted in November 2011, with areas extending northward to capture the remaining gravel reserves. in October 2012, the BC Agricultural Land Commission approved the application and, as a result, mining is projected to continue to 2018 or later. We will continue to provide quarterly reports and give reclamation advice until the mine is fully reclaimed, which we anticipate will be between 2020 and 2023.
More Environmental Projects
See all projects

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment

Transportation
Edmonton Valley Line – Stage 1

Environmental
Francis Cooke Landfill Operations Plan

Strategic Advisory Services
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Climate Change Adaptation & Mitigation
Calgary Northwest Inner City Drainage Study

Environmental
37 Street SW Storm Trunk Relocation

Environmental
Calgary Zoo Flood Mitigation

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization

Environmental
Contamination Management, Valley Line LRT

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Environmental
Data System Planning

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Port of Vancouver – Climate Change Adaptation

Infrastructure
Drainage Improvement Study

Environmental
Bow River Pedestrian Bridge and Utility Crossing
LEADERSHIP INSIGHTS
See all insights